AJC Contractors Limited
AJC Contractors Limited
AJC Contractors Limited
AJC Contractors Limited
AJC Contractors Limited
AJC Contractors Limited
AJC Contractors Limited
AJC Contractors Limited


 

Amec Southend College.
This project was undertaken for South East Essex University on behalf of AMEC Design and Build Team based at AMECS Ipswich Offices.
AJC undertook the groundwork elements of the job from Piling Mat to the Concrete Slabs and all the Structural Concrete and Rebar on the Hollow Rib floor from ground level to the sixth storey.

 

Attleborough.
AJC undertook a day-work project for May Gurney which was a new bridge across the A11 in Attenborough.. Our contribution to the project was the reinforcement, formwork and concrete.
We also supplied various facets for the false-work.

 
Barking Furlongs.
This project was a housing development for Furlong Homes at Abbey Road Barking
AJC undertook the Podium false-work package from Manns Civil Engineering.Our remit was to form the Podium Slab with all associated works including formwork, rebar, and concrete
 
British Rail.
Network Rail contracts are affiliated through the Achilles link up Programme which AJC are members of.
Our work with Network Rail varies from installing electronic entry systems to tarmacing roads.
 
Cama House.
This project was a refurbishment and extension to a private dwelling.
AJC project managed the whole project from start to completion, including all plumbing electrical plastering and windows to the finished specification.
 
Dartford.
This contract was for John Sisk and Mann Construction
Our involvement on this project was all the concrete, rebar and form-work for this three story office block
Each project is taken as a unique building in its own right, and the system for the false-work is designed to compliment that particular building and the peripheral conditions.
 
Dorva Brentwood.
We work in various EDF electrical installations in conjunction with Dorval construction
Our remit on the Brentwood project, was to enlarge the existing structure with reinforcement concrete walls and new stairs leading to the basement. This included sheet pilling to retain the earth.
 
Harlow.
The works at Harlow are for William Verry Construction and include a 3 storey and 5 storey reinforced concrete frame which we under take including all access by means of Haki Staircases.
Also on this project are 9 podium reinforced decks.
 
Knights Chadwell Heath.
The Chadwell Heath works consisted of two underground car parks for Wimpy Homes in conjunction with Knights of Kelvedon
These works consisted of all concrete work, rebar and formworks
 
Laings College Southend.
The Southend Hospital contract was made up of various elements, from hoarding, covered walkways, a refurbished radio room, metal drainage and all elements of the groundwork.
 
Orourke Southend Hospital (Laing).
The Southend Hospital contract was made up of various elements, from hoarding, covered walkways, a refurbished radio room, metal drainage and all elements of the groundwork.
 
Paddington.
This was a 0one off unique project in Paddington for Harris Calnan
As you can see from the model, the roof structure was formed with various falls and apexes as set out by our engineer.
To support this structure we concreted the first floor, and then had to build a support deck to allow us to form the roof itself. This was all made using traditional ways, with acrows and timbers due to the lack of other options that were available to us.
Once the soffitt was formed, and the rebar was placed, we had to form a top shutter to hold the concrete in place due to the server splays.
 
St _Marys Knights.
This project was for Barrett Homes in conjunction with Knights of Kelevedon.
The underground car park was part of the podium that was built on.
Our task here was to construct the concrete frame ready for Barretts to continue the project.
 
Takeley.

 
New Asphalt Plant, Cliffe Quay Ipswich.
Tarmac are the client
Jackson are the main contractors and S E  H are  the sub-contractors who we are working for
Are schedule of works is the formwork ,rebar and concrete.
Most of the walls are constructed using our Doka system and are 6m high ,500mm thick and in pours of 16m long  
 

 



  Listed in Ufindus - Groundwork Contractors